Issuance of Occupancy Permit
About the Service
No building or structure shall be used or occupied wholly or partly without first obtaining a Certificate of Occupancy from the Building Official where the subject building or structure is located. A Certificate of Occupancy shall be issued by the Building Official after final inspection and submission of requirements and if the building or structure conforms with the requirement of the Code and its IRR.
How to avail of the service and Time frame of Issuance
Steps | It Will Take You | Please Approach | ||
---|---|---|---|---|
1 | Submit the Requirements | The OBO conducts inspection of the building or structure if it conforms with the requirement of the Code and its IRR | 30-45 minutes | -Aldemar D. Tupas -Heirene C. Gempasao -Mary Ann A. Obidas -Rizalie B. Dacules |
2 | Signature of every section head and the Acting Building Official | 12 minutes | Charlie S. Hinolan Line & grade Anthony O. Sayo Sanitary/Plumbing Siena Lane Tanguan Electrical Charry C. Cangque Structural Rowena Briones-Lobaton Architectural Robert Joy Alipalo Mechanical |
|
Record and release plans, documents and retain an office file | -Aldemar D. Tupas -Heirene C. Gempasao -Mary Ann A. Obidas -Rizalie B. Dacules |
Documentary Requirements
When applying for Occupancy Permit, submit Four (4) sets of the following:
- For One (1) Storey Building
- Certificate of Completion ( duly accomplished and signed and sealed by Architect / Engineer)
- Fire Fund Fee Official Receipt ( from the Fire Department)
- For Two (2) Storey and up Building
- Certificate of Completion ( duly accomplished and signed and sealed by Architect / Engineer)
- Fire Fund Fee Official Receipt ( from the Fire Department)
- Construction Logbook (signed and sealed by Architect/Engineer)
Fees
Pursuant to Section 203, Subsection (4) of the P.D. 1096 which authorized the Secretary of the Department of Public Works and Highways to prescribe and fix the amount of fees and other charges that the Building Official may collect in connection with the performance of its regulatory functions, the attached Schedule of Building Permit Fees and other charges is hereby promulgated to form part of the Revised Implementing Rules and Regulations of P.D. 1096, otherwise known as the National Building Code of the Philippines.
See New Schedule of Fees and other Charges for the assessment of Fees.
NEW SCHEDULE OF FEES AND OTHER CHARGES
Certificates of Use or Occupancy (Table II.G.1. for fixed costing)
- Division A-1 and A-2 Buildings:
- Divisions B-1/E-1, 2, 3/F-1/G-1, 2, 3, 4, 5/H-1, 2, 3, 4/and I-1 Buildings:
- Divisions C-1, 2/D-1, 2, 3 Buildings:
- Division J-I Buildings/structures:
- Division J-2 Structures:
- Change in Use/Occupancy, per sq. meter or fraction thereof of area affected P5.00
i | Costing up to P150,000.00 | P100.00 |
ii | Costing more than P150,000.00 up to P400,000.00 | P200.00 |
iii | Costing more than P400,000.00 to P850,000.00 | P400.00 |
iv | Costing more than P850,000.00 up to P1,200,000.00 | P800.00 |
v | Every million or portion thereof in excess of P1,200,000.00 | P800.00 |
i | Costing up to P150,000.00 | P200.00 |
ii | Costing more than P150,000.00 up to P400,000.00 | P400.00 |
iii | Costing more than P400,000.00 to P850,000.00 | P800.00 |
iv | Costing more than P850,000.00 up to P1,200,000.00 | P1,000.00 |
v | Every million or portion thereof in excess of P1,200,000.00 | P1,000.00 |
i | Costing up to P150,000.00 | P150.00 |
ii | Costing more than P150,000.00 up to P400,000.00 | P250.00 |
iii | Costing more than P400,000.00 to P850,000.00 | P600.00 |
iv | Costing more than P850,000.00 up to P1,200,000.00 | P900.00 |
v | Every million or portion thereof in excess of P1,200,000.00 | P900.00 |
i | With floor area up to 20.00 sq.meters | P50.00 |
ii | With floor area above 20.00 sq.meters up to 500.00 sq.meters | P240.00 |
iii | With floor area above 500.00 sq.meters | P360.00 |
iv | With floor area above 1,000.00 sq.meters | P480.00 |
v | With floor area above 5,000.00 sq. meters up to 10,000.00 sq.meters | P1,200.00 |
With floor area above 10,000.00 sq.meters | P2,400.00 |
i | Garages, carports, balconies, terraces, lanais and the like: 50% of the rate of the principal building, of which they are accessories. | |
ii | Aviaries, aquariums, zoo structures and the like: same rates as for Section 10.d above. | |
iii | Towers such as for Radio and TV transmissions, cell site, sign (ground or roof type) and water tank supporting structures and the like in any location shall be imposed fees as follows. | |
(a)First 10.00 meters of height from the ground | P800.00 | |
(b)Every meter or fracton thereof in excess of 10.00 meters | P50.00 |